September 2009
- Frostec designed, constructed and installed a turn-key solution for the Aurora Kakadu Resort, South Alligator Kakadu. The new fully automated power station control system was installed and commissioned with minimal interruptions to normal resort activities.
- Adam Internet Data Centre
Frostec is pleased to be associated with Adam Internets new state of the art data centre. Two CAT C32 generators providing 2,200kVA will provide emergency power to the site. Designed with the latest Woodward Syncronising generator controllers & closed transition transfer switch controllers combined with an extensive UPS system will make this site a fully automated powerhouse able to withstand most any disaster that may be encountered.
August 2009
- Orica WaterCare
Frostec designed, constructed, installed & commissioned a fully automated Hydrochloric Acid unloading & batching plant at the harsh environment of the Penrice plant at Osborne.

January 2009
- Frostec installed a 550KVA generator at Adam Internet in their head quarters at King William Street, Adelaide.

March 2008
- The Frostec Group are now OLYMPIAN Generator Sets Authorised distributors, giving even greater levels of product service to our customers.
 |
|
|